Lang Yarns

USS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit Class

Description: USS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit Class USS Tinosa SSN-606 Submarine Model Sail again with the crew of the USS Tinosa SSN-606 in this handcrafted wooden Submarine Model. Each piece is carved from wood and handpainted to provide a piece you’ll love. Length 20 inches USS Tinosa (SSN-606) USS Tinosa (SSN-606), a Permit-class submarine, was the second ship of the United States Navy to be named for the tinosa, a poisonous, black, tropical fish. The contract to build her was awarded to Portsmouth Naval Shipyard in Kittery, Maine on 17 December 1958 and her keel was laid down on 24 November 1959. She was launched on 9 December 1961 sponsored by Mrs. Samuel S. Stratton,[1][2] the wife of Congressman Samuel S. Stratton of New York, and commissioned on 17 October 1964, with Commander Robert B. Brumsted in command. Service history Following shakedown out of New London, Connecticut, the submarine underwent availability at her builders yard from April to June 1966 before making a cruise to Faslane, Scotland, and the Caribbean Sea. After an overhaul which lasted from March through June 1967, the ship provided services for the Naval Underwater Sound Laboratory at New London through the first three months of 1968. During this tour, Tinosa was based briefly at Port Everglades, Florida, as well as at New London and visited Bermuda in the course of her operations. At the end of this experimental and test duty, Tinosa began local operations out of New London. Tinosa continued to work off the eastern seaboard and in the Caribbean into 1969. During her major overhaul in the spring of that year, she received the SUBSAFE submarine safety improvements designed in the wake of the tragic loss of submarine Thresher (SSN-593) in April 1963. Following the completion of this yard period in December 1971, Tinosa resumed active operations off the eastern seaboard and into the familiar waters of the Caribbean Sea and continued the routine into the middle of 1972. In July, she crossed the Atlantic for visits to ports in northern Europe and for deployment in the Mediterranean Sea with the 6th Fleet. After operating out of Sardinia and Holy Loch during this period, she returned home in December to conduct tests in conjunction with a project sponsored by the Massachusetts Institute of Technology. Tinosa worked out of New London from 1 February 1973 until the end of March, operating with submarines and surface craft on exercises and maneuvers. After a three-day visit to the United States Naval Academy in late April, where she served in a familiarization program for midshipmen, Tinosa underwent a tender availability alongside Fulton (AS-11) at New London. In ensuing months, the submarine was twice deployed to Bermuda and operated off Andros Island before participating in joint United States-Canadian antisubmarine warfare exercises in December off the Florida coast. After being dry-docked in auxiliary repair drydock USS Waterford (ARD-5) at New London from January to March 1974, Tinosa departed her home port on 19 May, bound for the Mediterranean, and conducted her second deployment with the Sixth Fleet through the summer months. She visited Bizerte from 24 June to 1 July and was the first nuclear-powered submarine to visit Tunisia. Returning to New London on 16 November, the ship operated locally out of her homeport into late February 1975. Subsequently, operating in the Narragansett Bay area into the spring of that year, Tinosa departed New London on 23 July, bound for Charleston, South Carolina. She later shifted south to operate off the Florida coast. The ship underwent a major overhaul at the Ingalls Shipbuilding yard at Pascagoula, Mississippi, from late 1975 to 12 December 1977. She then resumed operations with the Atlantic Fleet commencing with two months of weapons system testing in the Caribbean from 13 February to 20 May 1978. This was followed by a combined exercise with units of the Royal Canadian Navy off Florida in mid-April. Most of the summer was spent in preparing for Tinosas forthcoming deployment to the Mediterranean Sea. On 13 September, she departed New London for five months of operations with the Sixth Fleet. At the end of 1978, the nuclear attack submarine was in upkeep in La Maddalena, Sardinia, following operations with a NATO task force composed of United States, British, Italian, and Turkish naval units. On 4 January 1988, she departed New London for six months of operations with the Sixth Fleet in the Mediterranean. In October 1988 she departed New London for 60 days of North Atlantic Operations and crossed the Arctic Circle. History from 1979 to 1991 needed. In 1981 Tinosa visited Frederiksted St. Croix as a port visit in October that year Tinosa was deactivated while still in commission on 15 July 1991, then decommissioned and stricken from the Naval Vessel Register on 15 January 1992. ex-Tinosa entered the Nuclear Powered Ship and Submarine Recycling Program in Bremerton, Washington, on 15 July 1991 and on 26 June 1992 ceased to exist. USS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit Class USS Tinosa SSN-606 Submarine Model Sail again with the crew of the USS Tinosa SSN-606 in this handcrafted wooden Submarine Model. Each piece is carved from wood and handpainted to provide a piece you’ll love. Length 20 inches USS Tinosa (SSN-606) USS Tinosa (SSN-606), a Permit-class submarine, was the second ship of the United States Navy to be named for the tinosa, a poisonous, black, tropical fish. The contract to build her was awarded to Portsmouth Naval Shipyard in Kittery, Maine on 17 December 1958 and her keel was laid down on 24 November 1959. She was launched on 9 December 1961 sponsored by Mrs. Samuel S. Stratton,[1][2] the wife of Congressman Samuel S. Stratton of New York, and commissioned on 17 October 1964, with Commander Robert B. Brumsted in command. Service history Following shakedown out of New London, Connecticut, the submarine underwent availability at her builders yard from April to June 1966 before making a cruise to Faslane, Scotland, and the Caribbean Sea. After an overhaul which lasted from March through June 1967, the ship provided services for the Naval Underwater Sound Laboratory at New London through the first three months of 1968. During this tour, Tinosa was based briefly at Port Everglades, Florida, as well as at New London and visited Bermuda in the course of her operations. At the end of this experimental and test duty, Tinosa began local operations out of New London. Tinosa continued to work off the eastern seaboard and in the Caribbean into 1969. During her major overhaul in the spring of that year, she received the SUBSAFE submarine safety improvements designed in the wake of the tragic loss of submarine Thresher (SSN-593) in April 1963. Following the completion of this yard period in December 1971, Tinosa resumed active operations off the eastern seaboard and into the familiar waters of the Caribbean Sea and continued the routine into the middle of 1972. In July, she crossed the Atlantic for visits to ports in northern Europe and for deployment in the Mediterranean Sea with the 6th Fleet. After operating out of Sardinia and Holy Loch during this period, she returned home in December to conduct tests in conjunction with a project sponsored by the Massachusetts Institute of Technology. Tinosa worked out of New London from 1 February 1973 until the end of March, operating with submarines and surface craft on exercises and maneuvers. After a three-day visit to the United States Naval Academy in late April, where she served in a familiarization program for midshipmen, Tinosa underwent a tender availability alongside Fulton (AS-11) at New London. In ensuing months, the submarine was twice deployed to Bermuda and operated off Andros Island before participating in joint United States-Canadian antisubmarine warfare exercises in December off the Florida coast. After being dry-docked in auxiliary repair drydock USS Waterford (ARD-5) at New London from January to March 1974, Tinosa departed her home port on 19 May, bound for the Mediterranean, and conducted her second deployment with the Sixth Fleet through the summer months. She visited Bizerte from 24 June to 1 July and was the first nuclear-powered submarine to visit Tunisia. Returning to New London on 16 November, the ship operated locally out of her homeport into late February 1975. Subsequently, operating in the Narragansett Bay area into the spring of that year, Tinosa departed New London on 23 July, bound for Charleston, South Carolina. She later shifted south to operate off the Florida coast. The ship underwent a major overhaul at the Ingalls Shipbuilding yard at Pascagoula, Mississippi, from late 1975 to 12 December 1977. She then resumed operations with the Atlantic Fleet commencing with two months of weapons system testing in the Caribbean from 13 February to 20 May 1978. This was followed by a combined exercise with units of the Royal Canadian Navy off Florida in mid-April. Most of the summer was spent in preparing for Tinosas forthcoming deployment to the Mediterranean Sea. On 13 September, she departed New London for five months of operations with the Sixth Fleet. At the end of 1978, the nuclear attack submarine was in upkeep in La Maddalena, Sardinia, following operations with a NATO task force composed of United States, British, Italian, and Turkish naval units. On 4 January 1988, she departed New London for six months of operations with the Sixth Fleet in the Mediterranean. In October 1988 she departed New London for 60 days of North Atlantic Operations and crossed the Arctic Circle. History from 1979 to 1991 needed. In 1981 Tinosa visited Frederiksted St. Croix as a port visit in October that year Tinosa was deactivated while still in commission on 15 July 1991, then decommissioned and stricken from the Naval Vessel Register on 15 January 1992. ex-Tinosa entered the Nuclear Powered Ship and Submarine Recycling Program in Bremerton, Washington, on 15 July 1991 and on 26 June 1992 ceased to exist. × × × × × × Buy now and save! Shipping info Click the Shipping & Payments tab above the listing description for more info FREE Shipping Click the Shipping & Payments tab above the listing description for more info! Additional delivery notes PICK UP OPTION Sorry, our items are NOT available for pick-up. PAYMENT Immediate payment is required upon selecting "Buy It Now" or upon checking out through the cart. We accept payment via U.S. PayPal accounts and all Major Credit Cards, Debit Cards & Google Pay. We are legally required to collect sales tax in those states and localities where we maintain a physical presence (nexus). The applicable amount of sales tax charged to an order will be calculated based on the shipment destination's state and local sales tax laws. Thank you for shopping with us on eBay! Additional Information No additional information at this time Ask seller a question You might also like 156th Tactical Fighter Wing Patch – hook and loop 156th Tactical Fighter Wing Patch – Plastic Backing/ Sew On VMM-268 Red Dragons Friday 2021 Patch – With Hook and Loop VAQ-133 Wizards Skull PVC Glow Patch - With Hook and Loop Contact To contact our Customer Service Team, simply click the button here and our Customer Service team will be happy to assist. Ask seller a question © Squadron Nostalgia LLC Shipping & Payments Shipping is FREE for this item Payment Accepted Payment Methods Immediate payment is required upon selecting "Buy It Now" or upon checking out through the cart. We accept payment via U.S. PayPal accounts and all Major Credit Cards, Debit Cards & Google Pay. We are legally required to collect sales tax in those states and localities where we maintain a physical presence (nexus). The applicable amount of sales tax charged to an order will be calculated based on the shipment destination's state and local sales tax laws. Thank you for shopping with us on eBay! Returns Returns are accepted Items must be returned within 30 days of the auction ending Seller will pay for return shipping. eBay integration by

Price: 459 USD

Location: Seymour, Tennessee

End Time: 2024-02-12T17:39:41.000Z

Shipping Cost: 0 USD

Product Images

USS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit ClassUSS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit ClassUSS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit ClassUSS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit ClassUSS Tinosa SSN-606 Submarine Model, US Navy, Scale Model, Mahogany, Permit Class

Item Specifics

Return shipping will be paid by: Seller

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Return policy details:

Assembly Status: Ready to Go/Pre-built

Color: Black

Material: Wood

Item Length: 21 in

Subject: Submarine Model

Brand: Squadron Nostalgia LLC

Type: Submarine

Item Height: 8 inch

Theme: Militaria

Features: Wooden

Country/Region of Manufacture: Philippines

Item Width: 4 in

Item Weight: 4lbs

Recommended

Lockheed Martin® F-16 Fighting Falcon®, 8th Fighter Squadron Black Sheep, 18"
Lockheed Martin® F-16 Fighting Falcon®, 8th Fighter Squadron Black Sheep, 18"

$383.00

View Details
Lockheed Martin® F-16 Fighting Falcon®, 13th Fighter Squadron Panther Pack, 18"
Lockheed Martin® F-16 Fighting Falcon®, 13th Fighter Squadron Panther Pack, 18"

$383.00

View Details
Lockheed Martin® F-16 Fighting Falcon®, 314th Fighter Squadron (Flagship), 18"
Lockheed Martin® F-16 Fighting Falcon®, 314th Fighter Squadron (Flagship), 18"

$379.00

View Details
Sikorsky® UH-60 Blackhawk®, US Customs and Border Patrol Air and Marine, 1/38
Sikorsky® UH-60 Blackhawk®, US Customs and Border Patrol Air and Marine, 1/38

$395.00

View Details
Lockheed Martin®F-16C Fighting Falcon®, 113th Fighter Squadron Racers 1991, 18"
Lockheed Martin®F-16C Fighting Falcon®, 113th Fighter Squadron Racers 1991, 18"

$383.00

View Details
Lockheed Martin® (Consolidated) B-24H® Liberator®, 766th Bomb Squadron, 18"
Lockheed Martin® (Consolidated) B-24H® Liberator®, 766th Bomb Squadron, 18"

$379.00

View Details
Lockheed Martin® C-130H Hercules No 36 Squadron RAAF, Mahogany21" Scale Model
Lockheed Martin® C-130H Hercules No 36 Squadron RAAF, Mahogany21" Scale Model

$383.00

View Details
Lockheed Martin® C-130E, 62d Airlift Squadron Blue Barons Mahogany 1/74 (21")
Lockheed Martin® C-130E, 62d Airlift Squadron Blue Barons Mahogany 1/74 (21")

$383.00

View Details
Lockheed Martin® C-5A Galaxy®, 155th Airlift Squadron, 18" Mahogany Scale Model
Lockheed Martin® C-5A Galaxy®, 155th Airlift Squadron, 18" Mahogany Scale Model

$379.00

View Details
Lockheed Martin® F-16 Fighting Falcon®, 21st Fighter Squadron, 18" Mahogany
Lockheed Martin® F-16 Fighting Falcon®, 21st Fighter Squadron, 18" Mahogany

$379.00

View Details